Quality lab
Briarwick Point Testing Labs · Quality lab · Greenville, SC
Bastian Garroway manages quality at Briarwick Point Testing Labs, an incoming inspection lab in Greenville, and uses this to see every customer lot through the lab on schedule, with each project counting its own steps, hours and open findings.
ManufacturingProjectsLinked tables5 tables · 6 views · 1 form · 2 dimension sets · 1 dashboard · 1 document · 1 notification · 1 stage rule set · 1 agent
Use this templateProject board
Inspection projectsEngine mount castings lot 8851
Hose end fittings lot 4561
Lag screws lot 9944
Anchor bolts lot 9931
Mechanical seal faces lot 3360
Surgical clamp blanks lot 2310
Rotor laminations lot 5590
Pump shaft forgings lot 3341
Catheter hub moldings lot 2291
Control boards lot 5561
Landing bracket castings lot 8830
Hydraulic couplings lot 4533
Motor end bells lot 5530
Turbine housing casting lot 8814
Seal kits lot 4502
Stainless socket screws lot 9917
Hydraulic fittings lot 4471
Grade 8 hex bolts lot 9902
Impeller castings lot 3318
Bone screw blanks lot 2260
Ball valve bodies lot 7741
Tables
Inspection projects
22 sample rows · 21 columnsOne incoming lot from kickoff to handoff: what was sent, the plan, who leads it, and where it stands.
| Project | Project number | Customer | Part family | Inspection plan | Stage | Kickoff |
|---|---|---|---|---|---|---|
| Bronze elbows lot 1185 | BP-26-106 | Halvard Bend Marine Fittings | Jun 26, 2026 | |||
| Hydraulic fittings lot 4471 | BP-26-101 | Tallowmere Hydraulics, Inc. | Jul 10, 2026 | |||
| Grade 8 hex bolts lot 9902 | BP-26-102 | Ferrowick Fastener Supply | Jul 16, 2026 | |||
| Impeller castings lot 3318 | BP-26-103 | Quillon Gate Pump Works | Jul 21, 2026 | |||
| Bone screw blanks lot 2260 | BP-26-104 | Sorrel Lane Medical Devices | Jul 28, 2026 | |||
| Ball valve bodies lot 7741 | BP-26-105 | Osgood Run Valve Company | Jul 31, 2026 | |||
| Motor end bells lot 5530 | BP-26-107 | Pinecroft Electric Motors | Aug 25, 2026 | |||
| Seal kits lot 4502 | BP-26-109 | Tallowmere Hydraulics, Inc. | Sep 2, 2026 | |||
| Turbine housing casting lot 8814 | BP-26-108 | Daggett Ridge Aerospace Castings | Aug 27, 2026 | |||
| Stainless socket screws lot 9917 | BP-26-110 | Ferrowick Fastener Supply | Aug 31, 2026 | |||
| Control boards lot 5561 | BP-26-113 | Pinecroft Electric Motors | Sep 16, 2026 | |||
| Hydraulic couplings lot 4533 | BP-26-115 | Tallowmere Hydraulics, Inc. | Sep 22, 2026 |
Customers
8 sample rows · 11 columnsThe manufacturers who send their incoming parts to the lab, with who to call and what is in flight for each.
| Customer | Customer code | Industry | Quality contact | Contact phone | Contact email | Account status |
|---|---|---|---|---|---|---|
| Daggett Ridge Aerospace Castings | C-204 | Lorcan Beaumont-Pike | (864) 555-0134 | lorcan.beaumont@daggettridgecastings.com | ||
| Ferrowick Fastener Supply | C-203 | Marisol Adeyemi-Cole | (864) 555-0133 | marisol.adeyemicole@ferrowickfasteners.com | ||
| Halvard Bend Marine Fittings | C-208 | Anselm Kourakis | (864) 555-0138 | anselm.kourakis@halvardbendmarine.com | ||
| Osgood Run Valve Company | C-207 | Philippa Drummond-Nash | (864) 555-0137 | philippa.drummond@osgoodrunvalve.com | ||
| Pinecroft Electric Motors | C-206 | Hendrik Solomon-Ito | (864) 555-0136 | hendrik.solomon@pinecroftmotors.com | ||
| Quillon Gate Pump Works | C-202 | Obadiah Renner | (864) 555-0132 | obadiah.renner@quillongatepumps.com | ||
| Sorrel Lane Medical Devices | C-205 | Cassiopeia Oduya-Ferreira | (864) 555-0135 | cassiopeia.oduya@sorrellanemedical.com | ||
| Tallowmere Hydraulics, Inc. | C-201 | Isadora Venkataraman | (864) 555-0131 | isadora.venkataraman@tallowmerehydraulics.com |
Steps
50 sample rows · 9 columnsThe steps of one inspection — receiving, sampling, measuring, testing, the report and the handoff — each with an owner and a due date.
| Step | Step number | Project | Kind of step | Status | Owner | Due |
|---|---|---|---|---|---|---|
| Bronze elbows: dimensional check | TK-311 | Bronze elbows lot 1185 | Teodor Maxwell-Reyes | Jul 8, 2026 | ||
| Hydraulic fittings: dimensional check | TK-301 | Hydraulic fittings lot 4471 | Teodor Maxwell-Reyes | Jul 22, 2026 | ||
| Bronze elbows: customer handoff | TK-312 | Bronze elbows lot 1185 | Bastian Garroway | Jul 27, 2026 | ||
| Grade 8 hex bolts: material test | TK-303 | Grade 8 hex bolts lot 9902 | Ines Halloran-Vu | Jul 28, 2026 | ||
| Impeller castings: material test | TK-305 | Impeller castings lot 3318 | Ines Halloran-Vu | Jul 31, 2026 | ||
| Bone screw blanks: dimensional check | TK-307 | Bone screw blanks lot 2260 | Teodor Maxwell-Reyes | Aug 7, 2026 | ||
| Hydraulic fittings: customer handoff | TK-302 | Hydraulic fittings lot 4471 | Bastian Garroway | Aug 10, 2026 | ||
| Grade 8 hex bolts: customer handoff | TK-304 | Grade 8 hex bolts lot 9902 | Bastian Garroway | Aug 12, 2026 | ||
| Ball valve bodies: dimensional check | TK-309 | Ball valve bodies lot 7741 | Teodor Maxwell-Reyes | Aug 12, 2026 | ||
| Impeller castings: customer handoff | TK-306 | Impeller castings lot 3318 | Bastian Garroway | Aug 20, 2026 | ||
| Bone screw blanks: customer handoff | TK-308 | Bone screw blanks lot 2260 | Bastian Garroway | Aug 28, 2026 | ||
| Ball valve bodies: customer handoff | TK-310 | Ball valve bodies lot 7741 | Bastian Garroway | Sep 1, 2026 |
Findings
13 sample rows · 9 columnsAnything that did not meet the plan, who decided what to do about it, and whether it is still open.
| Finding | Finding number | Project | Severity | Status | Disposition | Found |
|---|---|---|---|---|---|---|
| Grain size outside the certificate | NC-507 | Turbine housing casting lot 8814 | — | Sep 23, 2026 | ||
| Chemistry certificate does not match heat number | NC-509 | Pump shaft forgings lot 3341 | — | Sep 25, 2026 | ||
| Solder bridge on two boards | NC-510 | Control boards lot 5561 | — | Sep 28, 2026 | ||
| Tensile specimen cut waiting on customer drawing | NC-511 | Landing bracket castings lot 8830 | — | Sep 30, 2026 |
Also included
- Project board
- Step coming dueWarns the owner two days before a step is due.
- Handoff letterThe cover letter that goes out with a signed inspection report.
Related templates
- Furniture workshopThistledown Crossing Woodworks4 tables · 5 views · 1 form · 1 dashboard · 1 digest · 1 notification · 1 agentTimeline
- Metal fabrication shopNettlefield Creek Fabrication3 tables · 4 views · 1 form · 1 dimension set · 1 dashboard · 1 digest · 1 notification · 1 agentTimeline
- Third-party warehouseBirchcombe Grove Logistics4 tables · 8 views · 1 form · 3 dimension sets · 1 dashboard · 1 digest · 1 stage rule set · 1 agentTimeline
- Apparel makerDovecote Commons Apparel5 tables · 5 views · 1 form · 1 dimension set · 1 dashboard · 1 drill-down · 1 digest · 1 notification · 1 agentDimensions
- Apparel makerTidewell Way Apparel4 tables · 6 views · 1 form · 1 dimension set · 1 booking page · 1 portal · 1 dashboard · 1 digest · 1 notification · 1 stage rule set · 1 agentCalendar
- Brewery productionCindervale Row Brewworks4 tables · 6 views · 1 form · 1 dashboard · 1 digest · 1 notification · 1 agentImports