Architecture practice
Ivybridge Way Architects · Architecture practice · Duluth, MN
Ziva Gorski is the studio manager at Ivybridge Way Architects, a six-person architecture studio in Duluth, and each Monday she opens one dashboard of hours logged and fees billed for every kind of project, so the principals see where the week went without a spreadsheet.
Legal and professionalReportingDashboards3 tables · 4 views · 1 form · 1 dimension set · 1 dashboard · 1 digest · 1 notification · 1 agent
Use this templateEntry board
Time entriesLogged4
Client presentation boards, Harrowgate apartmentsHarrowgate apartments phase twoMultifamily
Window and door schedule, Old CanneryOld Cannery lofts conversionAdaptive reuse
Plan set drafting, Stillwater ElementaryStillwater Elementary library wingCivic and school
Site visit report, Cobbler's RowCobbler's Row townhomesMultifamily
Approved17
Bidder questions, Larchwood RowLarchwood Row taproom build-outTenant improvement
Reflected ceiling plans, Dunmore HillDunmore Hill residence additionResidential
Schematic sections, Kestrel PointKestrel Point lake houseResidential
Bid comparison sheet, Larchwood RowLarchwood Row taproom build-outTenant improvement
Client presentation boards, Kestrel PointKestrel Point lake houseResidential
12 moreInvoiced19
RFI response, Larchwood RowLarchwood Row taproom build-outTenant improvement
Existing conditions measure-up, Granary HallGranary Hall community theaterAdaptive reuse
Pay application check, Cobbler's RowCobbler's Row townhomesMultifamily
Material selections, Dunmore HillDunmore Hill residence additionResidential
Code review notes, Stillwater ElementaryStillwater Elementary library wingCivic and school
14 moreTables
Time entries
40 sample rows · 10 columnsEvery block of studio time logged against a project, by person and phase, with what it bills.
| What was done | Project | Project type | Phase | Day worked | Who | Hours |
|---|---|---|---|---|---|---|
| Plan set drafting, Stillwater Elementary | Stillwater Elementary library wing | Civic and school | Construction documents | Oct 2, 2026 | Alaric Tiernan-Sloane | 5 |
| Site visit report, Cobbler's Row | Cobbler's Row townhomes | Multifamily | Construction administration | Oct 2, 2026 | Casimir Dellacroix-Hu | 7 |
| Window and door schedule, Old Cannery | Old Cannery lofts conversion | Adaptive reuse | Design development | Sep 30, 2026 | Casimir Dellacroix-Hu | 4.5 |
| Client presentation boards, Harrowgate apartments | Harrowgate apartments phase two | Multifamily | Schematic design | Sep 28, 2026 | Casimir Dellacroix-Hu | 3.5 |
| Detail sheets, Dunmore Hill | Dunmore Hill residence addition | Residential | Construction documents | Sep 25, 2026 | Alaric Tiernan-Sloane | 2 |
| Interior elevations, Stillwater Elementary | Stillwater Elementary library wing | Civic and school | Design development | Sep 25, 2026 | Nerissa Oyelowo-Brandt | 2 |
| Schematic sections, Old Cannery | Old Cannery lofts conversion | Adaptive reuse | Schematic design | Sep 24, 2026 | Casimir Dellacroix-Hu | 4 |
| Material selections, Fire station | Fire station four bay expansion | Civic and school | Design development | Sep 24, 2026 | Nerissa Oyelowo-Brandt | 4 |
| Schematic sections, Harrowgate apartments | Harrowgate apartments phase two | Multifamily | Schematic design | Sep 24, 2026 | Casimir Dellacroix-Hu | 5 |
| Addendum drafting, Seventh Street | Seventh Street clinic suite | Tenant improvement | Bidding | Sep 23, 2026 | Casimir Dellacroix-Hu | 4 |
| Sun and view study, Kestrel Point | Kestrel Point lake house | Residential | Schematic design | Sep 22, 2026 | Nerissa Oyelowo-Brandt | 2 |
| Window and door schedule, Dunmore Hill | Dunmore Hill residence addition | Residential | Design development | Sep 21, 2026 | Alaric Tiernan-Sloane | 7 |
28 more rows
Projects
10 sample rows · 11 columnsEvery commission the studio is working on, with its phase, fee and what has been logged and invoiced against it.
| Project | Client | Project type | Phase | Contract fee | Started | Target completion |
|---|---|---|---|---|---|---|
| Cobbler's Row townhomes | Octavia Pemberton-Wray | Multifamily | Construction administration | $205,000 | Aug 11, 2025 | Nov 19, 2026 |
| Dunmore Hill residence addition | Theodora Brackenridge-Reyes | Residential | Construction documents | $86,000 | Jan 18, 2026 | Nov 14, 2026 |
| Fire station four bay expansion | Millbrook township office | Civic and school | Design development | $131,000 | Apr 18, 2026 | Aug 1, 2027 |
| Granary Hall community theater | Anselm Okafor-Dray | Adaptive reuse | Programming | $96,000 | Aug 21, 2026 | Nov 29, 2027 |
| Harrowgate apartments phase two | Leopold Achterkamp-Dunne | Multifamily | Schematic design | $188,000 | Jun 27, 2026 | Oct 20, 2027 |
| Kestrel Point lake house | Thorvald Brennerman | Residential | Schematic design | $142,000 | Jul 7, 2026 | Jun 22, 2027 |
| Larchwood Row taproom build-out | Marisol Venkataraman-Pike | Tenant improvement | Construction administration | $38,000 | Dec 9, 2025 | Sep 15, 2026 |
| Old Cannery lofts conversion | Beatrix Hollingsworth | Adaptive reuse | Design development | $228,000 | Mar 9, 2026 | Aug 31, 2027 |
| Seventh Street clinic suite | Ephraim Lindqvist-Obi | Tenant improvement | Bidding | $52,000 | May 8, 2026 | Feb 2, 2027 |
| Stillwater Elementary library wing | Stillwater district facilities office | Civic and school | Construction documents | $174,000 | Feb 7, 2026 | Mar 4, 2027 |
Forms and booking
Log time
FormLog timeHow a team member puts a block of finished work onto a project.
What did you work on? *
Which project was it for? *
What type of project is that? *ResidentialTenant improvementAdaptive reuseCivic and schoolMultifamilyMatches the project's type.
Which phase were you in? *ProgrammingSchematic designDesign developmentConstruction documentsBiddingConstruction administration
Which day did you do it? *
How many hours? *
What does the time bill at?
Log the timeDashboards
The studio's week
Time entriesHours logged162.5
Fees billed by project type
- Tenant improvement$3,312
- Adaptive reuse$3,552
- Multifamily$4,857
- Residential$6,698
- Civic and school$5,238
Hours by week
- Aug 23, 202635.5
- Aug 30, 202622.5
- Sep 6, 202621
- Sep 13, 202633.5
- Sep 20, 202630
- Sep 27, 202620
Entries by status
- Invoiced19
- Approved17
- Logged4
Hours by phase
- Construction administration23.5
- Programming5
- Design development50
- Construction documents35.5
- Bidding17.5
- Schematic design31
Hours by person162.5
Also included
- Time ready to invoiceDigest
- Time loggedNotificationLets the studio manager know when new time lands to be approved.
Related templates
- Real estate law firmUmberfield Springs Real Estate Law3 tables · 5 views · 1 form · 1 dimension set · 1 dashboard · 1 digest · 1 stage rule set · 1 agentDashboards
- Tax preparation officeUpperbrook Valley Tax Services3 tables · 5 views · 1 form · 1 dimension set · 1 dashboard · 1 digest · 1 stage rule set · 1 agentDashboards
- Accounting firmAlbright Tillman CPA Group5 tables · 7 views · 1 form · 2 dimension sets · 1 dashboard · 1 document · 1 notification · 1 stage rule set · 1 agentLinked tables
- Accounting firmVineholt Harbor CPA4 tables · 6 views · 2 forms · 2 dimension sets · 1 portal · 1 dashboard · 1 digest · 1 document · 1 notification · 2 stage rule sets · 1 row action · 1 agentClient portals
- Accounting firmSilverbirch Hill CPA4 tables · 5 views · 1 form · 2 dimension sets · 1 dashboard · 1 drill-down · 1 digest · 1 notification · 1 agentDimensions
- Architecture practiceBramblewood Terrace Architects3 tables · 5 views · 1 form · 1 dimension set · 1 dashboard · 1 notification · 1 stage rule set · 1 agentGallery