Plumbing contractor: Kestrelmoor Junction Plumbing

Plumbing contractor · Tacoma, WA

Zoltan Blackwood is the office manager at Kestrelmoor Junction Plumbing, a five-truck plumbing company in Tacoma, and he lays out every service call as a run of dated steps so each job reaches handoff on the day promised.

Construction and tradesProjectsTimeline3 tables · 6 views · 1 form · 2 dimension sets · 1 digest · 1 notification · 1 agent
Use this template

Job timeline

Steps
Sep 9, 2026Oct 15, 2026
Permit and locate, Brandt water heater
Shutoff and demo, Brandt water heater
Fixture set, Brandt water heater
Pressure test, Brandt water heater
Walkthrough and handoff, Brandt water heater
Permit and locate, Okonkwo sewer line
Shutoff and demo, Okonkwo sewer line
Rough-in, Okonkwo sewer line
Inspection, Okonkwo sewer line
Pressure test, Okonkwo sewer line
Walkthrough and handoff, Okonkwo sewer line
Permit and locate, Pellegrino kitchen repipe
Shutoff and demo, Pellegrino kitchen repipe
Rough-in, Pellegrino kitchen repipe

Tables

Steps

48 sample rows · 10 columns

Each stage of a service call, with the crew, the start and finish and what was budgeted for it.

StepWork ticketJobKind of stepForemanStartsFinishes
Permit and locate, Brandt water heaterKP-4101Brandt water heater replacementPermit and locateIgnatius Delacroix-BoatengSep 9, 2:30 PMSep 9, 10:30 PM
Shutoff and demo, Brandt water heaterKP-4102Brandt water heater replacementShutoff and demoIgnatius Delacroix-BoatengSep 10, 2:30 PMSep 10, 10:30 PM
Fixture set, Brandt water heaterKP-4103Brandt water heater replacementFixture setIgnatius Delacroix-BoatengSep 11, 2:30 PMSep 14, 10:30 PM
Pressure test, Brandt water heaterKP-4104Brandt water heater replacementPressure testIgnatius Delacroix-BoatengSep 15, 2:30 PMSep 15, 10:30 PM
Walkthrough and handoff, Brandt water heaterKP-4105Brandt water heater replacementWalkthrough and handoffIgnatius Delacroix-BoatengSep 16, 2:30 PMSep 16, 10:30 PM
Permit and locate, Okonkwo sewer lineKP-4106Okonkwo sewer line repairPermit and locateEvander Tillinghast-OkaforSep 17, 2:30 PMSep 17, 10:30 PM
Shutoff and demo, Okonkwo sewer lineKP-4107Okonkwo sewer line repairShutoff and demoEvander Tillinghast-OkaforSep 18, 2:30 PMSep 18, 10:30 PM
Rough-in, Okonkwo sewer lineKP-4108Okonkwo sewer line repairRough-inEvander Tillinghast-OkaforSep 21, 2:30 PMSep 23, 10:30 PM
Inspection, Okonkwo sewer lineKP-4109Okonkwo sewer line repairInspectionEvander Tillinghast-OkaforSep 24, 2:30 PMSep 24, 10:30 PM
Pressure test, Okonkwo sewer lineKP-4110Okonkwo sewer line repairPressure testEvander Tillinghast-OkaforSep 28, 2:30 PMSep 28, 10:30 PM
Walkthrough and handoff, Okonkwo sewer lineKP-4111Okonkwo sewer line repairWalkthrough and handoffEvander Tillinghast-OkaforSep 29, 2:30 PMSep 29, 10:30 PM
Permit and locate, Pellegrino kitchen repipeKP-4112Pellegrino kitchen repipePermit and locatePhilomena Strandvik-OseiOct 7, 2:30 PMOct 7, 10:30 PM

36 more rows

Jobs

8 sample rows · 14 columns

Each service call or project from signed estimate to handoff, with the price and what its steps have done.

JobCustomerSite addressKind of workContract priceKickoffHandoff due
Brandt water heater replacementGideon and Marit Brandt4118 Tolliver Brae St, Tacoma, WAWater heater swap$2,600Sep 9, 2026Sep 17, 2026
Okonkwo sewer line repairObinna Okonkwo-Reyes920 Hawkridge Spur Ave, Tacoma, WASewer line repair$11,400Sep 17, 2026Sep 30, 2026
Pellegrino kitchen repipeMarcello and Perdita Pellegrino77 Quillon Mead Way, Tacoma, WARepipe$15,600Oct 7, 2026Oct 26, 2026
Lindqvist whole-house repipeBronwyn and Sigurd Lindqvist-Hale1208 Larkwood Terrace Ln, Tacoma, WARepipe$28,600Oct 26, 2026Nov 16, 2026
Vandermolen bathroom remodel plumbingAnnelise Vandermolen3302 Osprey Lantern Rd, Tacoma, WABathroom remodel$20,550Oct 27, 2026Nov 18, 2026
Thackeray tankless water heater installProsper Thackeray-Ade615 Pennywhistle Cove Dr, Tacoma, WATankless install$4,300Nov 4, 2026Nov 16, 2026
Fairweather hydronic boiler swapLeocadia Fairweather-Mbeki54 Bellwether Fold Ct, Tacoma, WABoiler swap$12,150Nov 12, 2026Nov 26, 2026
Aldridge backflow and irrigation tie-inCaspian Aldridge-Wren2290 Ashgrove Tarn Pl, Tacoma, WABackflow and irrigation$4,800Nov 20, 2026Dec 2, 2026

Also included

  • Steps on holdDigest
  • Step put on holdNotificationPings the office when any step is put on hold, ahead of the customer's call about the delay.

Questions

What is included in the Plumbing contractor: Kestrelmoor Junction Plumbing template?
2 tables (Steps and Jobs), filled with 56 sample rows so every view opens with realistic data.
Is the Plumbing contractor: Kestrelmoor Junction Plumbing template free?
Yes. Sign up free, press Use this template, and a full copy is added to your workspace.
Can I change the template after I use it?
Yes. Every page, table, column and view in your copy is yours to rename, edit or delete, and the sample rows can be cleared.