Templates

Plumbing contractor: Kestrelmoor Junction Plumbing

Plumbing contractor · Tacoma, WA

Zoltan Blackwood is the office manager at Kestrelmoor Junction Plumbing, a five-truck plumbing company in Tacoma, and he lays out every service call as a run of dated steps so each job reaches handoff on the day promised.

Construction and tradesProjectsTimeline3 tables · 6 views · 1 form · 2 dimension sets · 1 digest · 1 notification · 1 agent
Use this template

Job timeline

Steps
Sep 24, 2026Oct 30, 2026
Permit and locate, Brandt water heater
Shutoff and demo, Brandt water heater
Fixture set, Brandt water heater
Pressure test, Brandt water heater
Walkthrough and handoff, Brandt water heater
Permit and locate, Okonkwo sewer line
Shutoff and demo, Okonkwo sewer line
Rough-in, Okonkwo sewer line
Inspection, Okonkwo sewer line
Pressure test, Okonkwo sewer line
Walkthrough and handoff, Okonkwo sewer line
Permit and locate, Pellegrino kitchen repipe
Shutoff and demo, Pellegrino kitchen repipe
Rough-in, Pellegrino kitchen repipe

Tables

Steps

48 sample rows · 10 columns

Each stage of a service call, with the crew, the start and finish and what was budgeted for it.

StepWork ticketJobKind of stepForemanStartsFinishes
Permit and locate, Brandt water heaterKP-4101Brandt water heater replacementPermit and locateIgnatius Delacroix-BoatengSep 24, 2:30 PMSep 24, 10:30 PM
Shutoff and demo, Brandt water heaterKP-4102Brandt water heater replacementShutoff and demoIgnatius Delacroix-BoatengSep 25, 2:30 PMSep 25, 10:30 PM
Fixture set, Brandt water heaterKP-4103Brandt water heater replacementFixture setIgnatius Delacroix-BoatengSep 28, 2:30 PMSep 29, 10:30 PM
Pressure test, Brandt water heaterKP-4104Brandt water heater replacementPressure testIgnatius Delacroix-BoatengSep 30, 2:30 PMSep 30, 10:30 PM
Walkthrough and handoff, Brandt water heaterKP-4105Brandt water heater replacementWalkthrough and handoffIgnatius Delacroix-BoatengOct 1, 2:30 PMOct 1, 10:30 PM
Permit and locate, Okonkwo sewer lineKP-4106Okonkwo sewer line repairPermit and locateEvander Tillinghast-OkaforOct 2, 2:30 PMOct 2, 10:30 PM
Shutoff and demo, Okonkwo sewer lineKP-4107Okonkwo sewer line repairShutoff and demoEvander Tillinghast-OkaforOct 5, 2:30 PMOct 5, 10:30 PM
Rough-in, Okonkwo sewer lineKP-4108Okonkwo sewer line repairRough-inEvander Tillinghast-OkaforOct 6, 2:30 PMOct 8, 10:30 PM
Inspection, Okonkwo sewer lineKP-4109Okonkwo sewer line repairInspectionEvander Tillinghast-OkaforOct 9, 2:30 PMOct 9, 10:30 PM
Pressure test, Okonkwo sewer lineKP-4110Okonkwo sewer line repairPressure testEvander Tillinghast-OkaforOct 13, 2:30 PMOct 13, 10:30 PM
Walkthrough and handoff, Okonkwo sewer lineKP-4111Okonkwo sewer line repairWalkthrough and handoffEvander Tillinghast-OkaforOct 14, 2:30 PMOct 14, 10:30 PM
Permit and locate, Pellegrino kitchen repipeKP-4112Pellegrino kitchen repipePermit and locatePhilomena Strandvik-OseiOct 22, 2:30 PMOct 22, 10:30 PM

36 more rows

Jobs

8 sample rows · 14 columns

Each service call or project from signed estimate to handoff, with the price and what its steps have done.

JobCustomerSite addressKind of workContract priceKickoffHandoff due
Brandt water heater replacementGideon and Marit Brandt4118 Tolliver Brae St, Tacoma, WAWater heater swap$2,600Sep 24, 2026Oct 2, 2026
Okonkwo sewer line repairObinna Okonkwo-Reyes920 Hawkridge Spur Ave, Tacoma, WASewer line repair$11,400Oct 2, 2026Oct 15, 2026
Pellegrino kitchen repipeMarcello and Perdita Pellegrino77 Quillon Mead Way, Tacoma, WARepipe$15,600Oct 22, 2026Nov 10, 2026
Lindqvist whole-house repipeBronwyn and Sigurd Lindqvist-Hale1208 Larkwood Terrace Ln, Tacoma, WARepipe$28,600Nov 10, 2026Nov 30, 2026
Vandermolen bathroom remodel plumbingAnnelise Vandermolen3302 Osprey Lantern Rd, Tacoma, WABathroom remodel$20,550Nov 11, 2026Dec 2, 2026
Thackeray tankless water heater installProsper Thackeray-Ade615 Pennywhistle Cove Dr, Tacoma, WATankless install$4,300Nov 19, 2026Nov 30, 2026
Fairweather hydronic boiler swapLeocadia Fairweather-Mbeki54 Bellwether Fold Ct, Tacoma, WABoiler swap$12,150Nov 26, 2026Dec 10, 2026
Aldridge backflow and irrigation tie-inCaspian Aldridge-Wren2290 Ashgrove Tarn Pl, Tacoma, WABackflow and irrigation$4,800Dec 4, 2026Dec 16, 2026

Also included

  • Steps on holdDigest
  • Step put on holdNotificationPings the office when any step is put on hold, ahead of the customer's call about the delay.

Questions

What is included in the Plumbing contractor: Kestrelmoor Junction Plumbing template?
2 tables (Steps and Jobs), filled with 56 sample rows so every view opens with realistic data.
Is the Plumbing contractor: Kestrelmoor Junction Plumbing template free?
Yes. Sign up free, press Use this template, and a full copy is added to your workspace.
Can I change the template after I use it?
Yes. Every page, table, column and view in your copy is yours to rename, edit or delete, and the sample rows can be cleared.