Templates

Environmental testing lab: Briarwick Landing Environmental Lab

Environmental testing lab · Duluth, MN

Bram Benvenuti is the lab manager at Briarwick Landing Environmental Lab, an environmental testing lab, and he uses this to run every sample from kickoff to handoff on time, with each project's samples and fees counted up from the bench.

AgricultureProjectsLinked tables4 tables · 6 views · 1 form · 1 digest · 1 document · 1 notification · 1 agent
Use this template

All samples

Samples
SampleSample IDProjectMatrixAnalysisBench statusCollected
Outfall 002 grabSMP-26-1002Ironwood Bay outfall monitoring, third quarterSurface waterBacteria (E. coli)ReportedSep 4, 2026
Outfall 001 grabSMP-26-1001Ironwood Bay outfall monitoring, third quarterSurface waterNutrientsReportedSep 4, 2026
Outfall 001 metalsSMP-26-1003Ironwood Bay outfall monitoring, third quarterSurface waterMetals panelReportedSep 15, 2026
Outfall 002 metalsSMP-26-1004Ironwood Bay outfall monitoring, third quarterSurface waterMetals panelReportedSep 15, 2026
MW-1 purge sampleSMP-26-1005Pelican Marsh well surveyGroundwaterPetroleum hydrocarbonsReportedSep 22, 2026
MW-2 purge sampleSMP-26-1006Pelican Marsh well surveyGroundwaterPetroleum hydrocarbonsReportedSep 22, 2026
MW-3 purge sampleSMP-26-1007Pelican Marsh well surveyGroundwaterMetals panelReportedSep 22, 2026
Boring B-1 at 4 ftSMP-26-1008Redcedar Phase II soil assessmentSoilPetroleum hydrocarbonsReportedOct 6, 2026
Boring B-2 at 4 ftSMP-26-1009Redcedar Phase II soil assessmentSoilPetroleum hydrocarbonsReportedOct 6, 2026
Boring B-3 at 6 ftSMP-26-1010Redcedar Phase II soil assessmentSoilMetals panelReportedOct 9, 2026
Lagoon cell 1 compositeSMP-26-1012Northfork lagoon nutrient studyWastewaterNutrientsReportedOct 12, 2026
Lagoon cell 2 compositeSMP-26-1013Northfork lagoon nutrient studyWastewaterNutrientsReportedOct 12, 2026

21 more rows

Tables

Samples

33 sample rows · 12 columns

Every sample from the day it is logged in to the day its results are reported.

SampleSample IDProjectMatrixAnalysisBench statusCollected
Outfall 002 grabSMP-26-1002Ironwood Bay outfall monitoring, third quarterSurface waterBacteria (E. coli)ReportedSep 4, 2026
Outfall 001 grabSMP-26-1001Ironwood Bay outfall monitoring, third quarterSurface waterNutrientsReportedSep 4, 2026
Outfall 001 metalsSMP-26-1003Ironwood Bay outfall monitoring, third quarterSurface waterMetals panelReportedSep 15, 2026
Outfall 002 metalsSMP-26-1004Ironwood Bay outfall monitoring, third quarterSurface waterMetals panelReportedSep 15, 2026
MW-1 purge sampleSMP-26-1005Pelican Marsh well surveyGroundwaterPetroleum hydrocarbonsReportedSep 22, 2026
MW-2 purge sampleSMP-26-1006Pelican Marsh well surveyGroundwaterPetroleum hydrocarbonsReportedSep 22, 2026
MW-3 purge sampleSMP-26-1007Pelican Marsh well surveyGroundwaterMetals panelReportedSep 22, 2026
Boring B-1 at 4 ftSMP-26-1008Redcedar Phase II soil assessmentSoilPetroleum hydrocarbonsReportedOct 6, 2026
Boring B-2 at 4 ftSMP-26-1009Redcedar Phase II soil assessmentSoilPetroleum hydrocarbonsReportedOct 6, 2026
Boring B-3 at 6 ftSMP-26-1010Redcedar Phase II soil assessmentSoilMetals panelReportedOct 9, 2026
Lagoon cell 1 compositeSMP-26-1012Northfork lagoon nutrient studyWastewaterNutrientsReportedOct 12, 2026
Lagoon cell 2 compositeSMP-26-1013Northfork lagoon nutrient studyWastewaterNutrientsReportedOct 12, 2026

21 more rows

Projects

11 sample rows · 13 columns

Each client job from kickoff to handoff, with the samples and fees rolled up from the bench.

ProjectProject numberClientProject stageKickoffHandoff dueProject lead
Ironwood Bay outfall monitoring, third quarterPRJ-26-201Ironwood Bay Sanitary DistrictHanded offAug 31, 2026Nov 5, 2026Ingrid Tallwater
Pelican Marsh well surveyPRJ-26-202Pelican Marsh Water AuthorityHanded offSep 16, 2026Nov 10, 2026Corwin Halvorsrud
Redcedar Phase II soil assessmentPRJ-26-203Redcedar Environmental ConsultingReportingSep 28, 2026Nov 25, 2026Ingrid Tallwater
Northfork lagoon nutrient studyPRJ-26-204Northfork Dairy CooperativeReportingOct 5, 2026Nov 27, 2026Ingrid Tallwater
Lakeshore drinking water compliance roundPRJ-26-205Lakeshore Township UtilitiesIn analysisOct 22, 2026Dec 2, 2026Corwin Halvorsrud
Wolf Run Creek bacteria watchPRJ-26-208Wolf Run Creek Watershed AssociationIn analysisNov 9, 2026Dec 4, 2026Dashiell Ferncliffe
Tamarack Ridge stormwater pond sedimentsPRJ-26-206Tamarack Ridge DevelopmentsIn analysisOct 26, 2026Dec 8, 2026Ingrid Tallwater
Birchline orchard runoff pesticide screenPRJ-26-207Birchline OrchardsIn analysisNov 3, 2026Dec 11, 2026Corwin Halvorsrud
Cedar Fork school well testingPRJ-26-211Cedar Fork School DistrictKickoffNov 20, 2026Dec 18, 2026Dashiell Ferncliffe
Ironwood Bay outfall monitoring, fourth quarterPRJ-26-209Ironwood Bay Sanitary DistrictSamplingNov 13, 2026Jan 1, 2027Ingrid Tallwater
Hollis Marsh restoration baselinePRJ-26-210Wolf Run Creek Watershed AssociationSamplingNov 17, 2026Jan 15, 2027Corwin Halvorsrud

Clients

9 sample rows · 9 columns

The utilities, farms, consultancies and townships that send samples to the lab.

ClientClient codeKind of clientContactContact phoneClient sinceBilling terms
Birchline OrchardsCL-107FarmOdette Lindqvist-Roy(218) 555-0167Nov 22, 2025Net 15
Cedar Fork School DistrictCL-109MunicipalityWinifred Achterlonie(218) 555-0169Nov 22, 2025Net 30
Ironwood Bay Sanitary DistrictCL-101Utility districtMarguerite Delacorte-Pyne(218) 555-0161Nov 22, 2020Net 30
Lakeshore Township UtilitiesCL-105MunicipalityPriyanka Fennimore(218) 555-0165Nov 22, 2019Net 30
Northfork Dairy CooperativeCL-104FarmLeopold Ashbourne(218) 555-0164Nov 22, 2023Net 30
Pelican Marsh Water AuthorityCL-102Utility districtEverett Thornquist(218) 555-0162Nov 22, 2021Net 30
Redcedar Environmental ConsultingCL-103ConsultancyAdaeze Vandermolen(218) 555-0163Nov 22, 2022Net 15
Tamarack Ridge DevelopmentsCL-106DeveloperCassius Ngata-Holm(218) 555-0166Nov 22, 2024Prepaid
Wolf Run Creek Watershed AssociationCL-108NonprofitTobias Ekwueme(218) 555-0168Nov 22, 2023Net 30

Also included

  • Samples on the instrumentDigest
  • Sample due tomorrowNotificationNudges the assigned chemist a day before a sample is due out.
  • Results cover letterDocumentThe note that rides on top of the data package at handoff.

Questions

What is included in the Environmental testing lab: Briarwick Landing Environmental Lab template?
3 tables (Samples, Projects and Clients), filled with 53 sample rows so every view opens with realistic data.
Is the Environmental testing lab: Briarwick Landing Environmental Lab template free?
Yes. Sign up free, press Use this template, and a full copy is added to your workspace.
Can I change the template after I use it?
Yes. Every page, table, column and view in your copy is yours to rename, edit or delete, and the sample rows can be cleared.