Sustainability consultancy

Ravenshaw Crossing Sustainability · Sustainability consultancy · Bend, OR

Saoirse Draycott runs Ravenshaw Crossing Sustainability, a four-person consultancy, and reads one timeline of every environmental assessment to see which ones will reach the client's hands before their promised date.

AgricultureProjectsTimeline4 tables · 6 views · 1 form · 2 dimension sets · 1 dashboard · 1 notification · 1 stage rule set · 1 agent
Use this template

Assessment timeline

Assessments
Mar 29, 2026Nov 3, 2026
Wetland buffer survey
Stormwater runoff survey
Truck idling study
Supplier packaging review
Irrigation scheduling
Roof solar feasibility
Ice plant efficiency
Veneer waste reuse
Grape press water
Fermentation tank cooling
Creamery energy
Orchard pollinator habitat
Delivery fleet emissions
Peat-free potting mix sourcing

Tables

Assessments

32 sample rows · 15 columns

Every assessment a client buys, from kickoff to handoff, with its owner, planned dates and fee.

ScopeAssessmentClientKind of assessmentStageOwnerKickoff
Manure handling emissionsRC-A105Stonepine Lumber YardBiodiversity surveyProposedEmrys Calloway-DubeNov 7, 2026
Milking parlor energyRC-A104Linnet Creek VineyardsEnergy auditProposedSaoirse DraycottOct 26, 2026
Wash line water useRC-A103Foxglove Mill BrewingWaste diversion studyProposedLinnea Oyedepo-StrandOct 19, 2026
Cold storage refrigerantsRC-A102Brackwater Dairy CooperativeWater use auditProposedEmrys Calloway-DubeOct 14, 2026
Packing shed energyRC-A101Hartsease Valley OrchardsCarbon footprintProposedSaoirse DraycottOct 10, 2026
Bottling line waterRC-A106Marrow Bay SeafoodsSupply chain reviewKicked offLinnea Oyedepo-StrandOct 2, 2026
Brewhouse heat recoveryRC-A107Ashlar Row ApartmentsCarbon footprintKicked offSaoirse DraycottSep 30, 2026
Spent grain diversionRC-A108Cobbledown Garden CentersWater use auditKicked offEmrys Calloway-DubeSep 29, 2026
Vineyard cover cropsRC-A109Hartsease Valley OrchardsWaste diversion studyKicked offLinnea Oyedepo-StrandSep 27, 2026
Frost fan fuel useRC-A110Brackwater Dairy CooperativeEnergy auditFieldworkSaoirse DraycottSep 23, 2026
Sawmill kiln energyRC-A111Foxglove Mill BrewingBiodiversity surveyFieldworkEmrys Calloway-DubeSep 20, 2026
Offcut waste diversionRC-A112Linnet Creek VineyardsSupply chain reviewFieldworkLinnea Oyedepo-StrandSep 16, 2026

20 more rows

Clients

8 sample rows · 8 columns

The farms, plants and property owners the firm assesses, with who to call and what they have bought.

ClientSectorContactContact phoneContact emailAssessments
Ashlar Row ApartmentsPropertyTiberius Kallinen-Mbeki(541) 555-0126tiberius.kallinen@ashlarrowapartments.netBrewhouse heat recovery, Boat fuel records, Fermentation tank cooling, Stormwater runoff survey
Brackwater Dairy CooperativeDairyMirabel Thornquist-Adeyemi(541) 555-0121mirabel.thornquist@brackwaterdairycoop.comCold storage refrigerants, Frost fan fuel use, Greenhouse heating, Ice plant efficiency
Cobbledown Garden CentersRetailEvangeline Hartnett-Quill(541) 555-0127evangeline.hartnett@cobbledowngardencenters.comSpent grain diversion, Common area lighting, Grape press water, Wetland buffer survey
Foxglove Mill BrewingBrewingCasimir Vandermeer-Ng(541) 555-0122casimir.vandermeer@foxglovemillbrewing.netWash line water use, Sawmill kiln energy, Peat-free potting mix sourcing, Roof solar feasibility
Hartsease Valley OrchardsFruit growingQuillon Abernathy-Osei(541) 555-0120quillon.abernathy@hartseasevalleyorchards.netPacking shed energy, Vineyard cover crops, Laundry water use, Veneer waste reuse
Linnet Creek VineyardsWineOttoline Pruitt-Nwachukwu(541) 555-0123ottoline.pruitt@linnetcreekvineyards.comMilking parlor energy, Offcut waste diversion, Delivery fleet emissions, Irrigation scheduling
Marrow Bay SeafoodsSeafoodPhilomela Okwuosa-Lund(541) 555-0125philomela.okwuosa@marrowbayseafoods.comBottling line water, Cannery water reuse, Creamery energy, Truck idling study
Stonepine Lumber YardForest productsBarnaby Eastwick-Sato(541) 555-0124barnaby.eastwick@stonepinelumberyard.netManure handling emissions, Dock lighting upgrade, Orchard pollinator habitat, Supplier packaging review

Milestones

81 sample rows · 5 columns

The steps inside an assessment, such as the site visit or the draft, each with its own status and hours.

MilestoneAssessmentStatusDueHours
Site visit and data pull: Wetland buffer surveyWetland buffer surveyDoneApr 8, 202620
Analysis model: Wetland buffer surveyWetland buffer surveyDoneApr 28, 202624
Draft report: Wetland buffer surveyWetland buffer surveyDoneMay 16, 202620
Site visit and data pull: Stormwater runoff surveyStormwater runoff surveyDoneMay 18, 202616
Analysis model: Stormwater runoff surveyStormwater runoff surveyDoneJun 7, 202620
Site visit and data pull: Truck idling studyTruck idling studyDoneJun 9, 202632
Draft report: Stormwater runoff surveyStormwater runoff surveyDoneJun 25, 202616
Site visit and data pull: Supplier packaging reviewSupplier packaging reviewDoneJun 27, 202628
Analysis model: Truck idling studyTruck idling studyDoneJun 29, 202636
Site visit and data pull: Irrigation schedulingIrrigation schedulingDoneJul 11, 202624
Analysis model: Supplier packaging reviewSupplier packaging reviewDoneJul 17, 202632
Draft report: Truck idling studyTruck idling studyDoneJul 17, 202632

69 more rows

Also included

  • Assessment boardStage rules
  • Draft with the clientNotificationTells the lead consultant the day a report draft goes to the client for sign-off.